Reference list

2017
CUSTOMER, PLANT:
LLC «Eyskiy Sea Port»
YEAR:
2017 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of design project for construction of dark oil products tank farm and boiler house
ACTIVITIES:
E
CUSTOMER, PLANT:
LLC «Lukoil-Komi»
YEAR:
2017 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Bayandy oil field infrastructure development. OTP "Bayandyskaya". Revamp of gas section, title 140"
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC «PGK»
YEAR:
2017 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of washing and steaming station at Novosibirsk branch of JSC "PGK"
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
LLC «Eyskiy Sea Port» 2017 - till present Development of design project for construction of dark oil products tank farm and boiler house
Регион, страна: Russia
E
LLC «Lukoil-Komi» 2017 - till present Bayandy oil field infrastructure development. OTP "Bayandyskaya". Revamp of gas section, title 140"
Регион, страна: Russia
E
JSC «PGK» 2017 - till present Revamp of washing and steaming station at Novosibirsk branch of JSC "PGK"
Регион, страна: Russia
E
2016
CUSTOMER, PLANT:
LLC «OMZ-DAELIM»
YEAR:
2016 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur Recovery Unit, Amine Regeneration Unit and Sour Water Stripper for «Deep Conversion Complex» (DCC) Construction Project at JSC «Gazpromneft-ONPZ»
ACTIVITIES:
EPs
CUSTOMER, PLANT:
LLC «Irkutsk Oil Company»
YEAR:
2016 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Markovskoe OGC field infrastructure development. Gas section
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC "Ryazan Refinery"
YEAR:
2016-present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of new two-block moisture-free hydrocarbon gases sulfur removal unit with rich amine regeneration unit
ACTIVITIES:
E
CUSTOMER, PLANT:
PJSC "Gazprom Automation"
YEAR:
2016-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Leakage detection system on the condensate pipeline Yamburg-Urengoy, I, and II lines
ACTIVITIES:
E
CUSTOMER, PLANT:
LLC «OMZ-DAELIM»
YEAR:
2016 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Сonstruction of Deep Conversion Complex Project at the existing JSC «Gazpromneft-ONPZ»
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC "Gazpromneft-Omsk Refinery"
YEAR:
2016-present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Reconstruction of a delayed coking unit 21-10 / 3M to give needle coke
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC "Slavneft-Yaroslavl Refinery"
YEAR:
2016-present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Unit of H2S recovery (МК-2)
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC "Ryazan Refinery"
YEAR:
2016
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Replacing worn-out all factory's fuel gas collector of JSC "Ryazan Refinery"
ACTIVITIES:
E
CUSTOMER, PLANT:
LLC «STAVROLEN»
YEAR:
2016 - till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Retrofitting of workshop №3 of Polyethylene Plant in order to bring into compliance with the requirements of valid RF codes and rules. PE Reactor Line «С» Retrofit
ACTIVITIES:
E
CUSTOMER, PLANT:
OJSC «MOZYR REFINERY»
YEAR:
2016 - till present
COUNTRY, REGION:
Republic of Belarus
NAME OF PROJECT, PLANT:
Provision of additional plate-type heat exchangers downstream of coolers Е-2007/A, B
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
LLC «OMZ-DAELIM» 2016 - till present Sulfur Recovery Unit, Amine Regeneration Unit and Sour Water Stripper for «Deep Conversion Complex» (DCC) Construction Project at JSC «Gazpromneft-ONPZ»
Регион, страна: Russia
EPs
LLC «Irkutsk Oil Company» 2016 - till present Markovskoe OGC field infrastructure development. Gas section
Регион, страна: Russia
E
JSC "Ryazan Refinery" 2016-present Construction of new two-block moisture-free hydrocarbon gases sulfur removal unit with rich amine regeneration unit
Регион, страна: Russia
E
PJSC "Gazprom Automation" 2016-till present Leakage detection system on the condensate pipeline Yamburg-Urengoy, I, and II lines
Регион, страна: Russia
E
LLC «OMZ-DAELIM» 2016 - till present Сonstruction of Deep Conversion Complex Project at the existing JSC «Gazpromneft-ONPZ»
Регион, страна: Russia
E
JSC "Gazpromneft-Omsk Refinery" 2016-present Reconstruction of a delayed coking unit 21-10 / 3M to give needle coke
Регион, страна: Russia
E
JSC "Slavneft-Yaroslavl Refinery" 2016-present Unit of H2S recovery (МК-2)
Регион, страна: Russia
E
JSC "Ryazan Refinery" 2016 Replacing worn-out all factory's fuel gas collector of JSC "Ryazan Refinery"
Регион, страна: Russia
E
LLC «STAVROLEN» 2016 - till present Retrofitting of workshop №3 of Polyethylene Plant in order to bring into compliance with the requirements of valid RF codes and rules. PE Reactor Line «С» Retrofit
Регион, страна: Russia
E
OJSC «MOZYR REFINERY» 2016 - till present Provision of additional plate-type heat exchangers downstream of coolers Е-2007/A, B
Регион, страна: Republic of Belarus
E
2015
CUSTOMER, PLANT:
PJSC "Rosneft" CCI "Yuganskneftegaz"JSC TomskNIPIneft
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Well infrastructure development at Petelinskoe oil field (group of wells №62,64,66)
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of Yareyuskoye oil field infrastructure from 2015 through to 2016
ACTIVITIES:
E
CUSTOMER, PLANT:
Oil Company Vostok-NAO
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Winter road connecting North Saremboyskoye oil field, Verhneyangareysky license area and Yangareysky license area, and winter road connecting Tedinskoye oil field and North Yareyayginsky license area
ACTIVITIES:
E
CUSTOMER, PLANT:
JSC RITEK
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Well infrastructure development: well №631 at Apalkovskoye field; wells №215, 219 at West-Bulkunovskoye field; well №32 at Novo-Dubrovskoye field; injection well №1005 at Bulatovskoye field; well №17 at Lapinskoye; well №521 at Brusovskoye field
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Capacity expansion of water injection pump station at South-Lyzhsky oil field in 2015
ACTIVITIES:
E
CUSTOMER, PLANT:
"LUKOIL-Komi", LLC CCI "Severneftegaz"
YEAR:
2015
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of well pad №7 of Vostochno-Sarutayuskoye oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
VolgogradNIPImorneft, LUKOIL-Engineering
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Left-bank group of oil fields
ACTIVITIES:
E
CUSTOMER, PLANT:
NNK-Spartakovskoye
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Koptevskoye oil field construction
ACTIVITIES:
E
CUSTOMER, PLANT:
"LUKOIL-Komi", LLC CCI "Severneftegaz"
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of well pads №4,5,6 of Vostochno-Sarutayuskoye oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
PJSC "Rosneft" CCI "Yuganskneftegaz" JSC "TomskNIPIneft"
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of well pads №82,83 of Petelinsky field
ACTIVITIES:
E
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
2015 - 2016
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Heavy Oil Residue Hydrocracking Complex. SRU №1
ACTIVITIES:
E
CUSTOMER, PLANT:
Stavrolen, LUKOIL
YEAR:
2015 - 2016
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Polyethylene production plant
ACTIVITIES:
E
CUSTOMER, PLANT:
Orsknefteorgsintez
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Packaged equipment for SRU
ACTIVITIES:
P
CUSTOMER, PLANT:
EuroChem
YEAR:
2015 - 2016
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Feasibility study of Proposal “Sour gas treating of Bashkir oil deposit of Astrakhan GCF”
ACTIVITIES:
E
CUSTOMER, PLANT:
Gazpromneft Omsk Refinery
YEAR:
2015-till present
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Flue Gas Treatment Unit for FCC
ACTIVITIES:
E
CUSTOMER, PLANT:
BYKOVOGAZ, LLC
YEAR:
2015 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Methanol recovery unit at the Gas Processing Plant of South-Kislovsky gas condensate field
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
PJSC "Rosneft" CCI "Yuganskneftegaz"JSC TomskNIPIneft 2015 - till present time Well infrastructure development at Petelinskoe oil field (group of wells №62,64,66)
Регион, страна: Russia
E
LUKOIL-Komi 2015 - till present time Development of Yareyuskoye oil field infrastructure from 2015 through to 2016
Регион, страна: Russia
E
Oil Company Vostok-NAO 2015 - till present time Winter road connecting North Saremboyskoye oil field, Verhneyangareysky license area and Yangareysky license area, and winter road connecting Tedinskoye oil field and North Yareyayginsky license area
Регион, страна: Russia
E
JSC RITEK 2015 - till present time Well infrastructure development: well №631 at Apalkovskoye field; wells №215, 219 at West-Bulkunovskoye field; well №32 at Novo-Dubrovskoye field; injection well №1005 at Bulatovskoye field; well №17 at Lapinskoye; well №521 at Brusovskoye field
Регион, страна: Russia
E
LUKOIL-Komi 2015 - till present time Capacity expansion of water injection pump station at South-Lyzhsky oil field in 2015
Регион, страна: Russia
E
"LUKOIL-Komi", LLC CCI "Severneftegaz" 2015 Construction of well pad №7 of Vostochno-Sarutayuskoye oilfield
Регион, страна: Russia
E
VolgogradNIPImorneft, LUKOIL-Engineering 2015-till present Left-bank group of oil fields
Регион, страна: Russia
E
NNK-Spartakovskoye 2015-till present Koptevskoye oil field construction
Регион, страна: Russia
E
"LUKOIL-Komi", LLC CCI "Severneftegaz" 2015-till present Construction of well pads №4,5,6 of Vostochno-Sarutayuskoye oilfield
Регион, страна: Russia
E
PJSC "Rosneft" CCI "Yuganskneftegaz" JSC "TomskNIPIneft" 2015-till present Construction of well pads №82,83 of Petelinsky field
Регион, страна: Russia
E
Mozyr Oil Refinery 2015 - 2016 Heavy Oil Residue Hydrocracking Complex. SRU №1
Регион, страна: Belarus
E
Stavrolen, LUKOIL 2015 - 2016 Polyethylene production plant
Регион, страна: Russia
E
Orsknefteorgsintez 2015-till present Packaged equipment for SRU
Регион, страна: Russia
P
EuroChem 2015 - 2016 Feasibility study of Proposal “Sour gas treating of Bashkir oil deposit of Astrakhan GCF”
Регион, страна: Russia
E
Gazpromneft Omsk Refinery 2015-till present Flue Gas Treatment Unit for FCC
Регион, страна: Russia
E
BYKOVOGAZ, LLC 2015 - till present time Methanol recovery unit at the Gas Processing Plant of South-Kislovsky gas condensate field
Регион, страна: Russia
E
2014
CUSTOMER, PLANT:
NK Bashneft, Ufa Oil Refinery
YEAR:
2014 - 2017
COUNTRY, REGION:
Ufa Oil Refinery, Russia
NAME OF PROJECT, PLANT:
Construction of Elementary Sulfur Recovery Unit
ACTIVITIES:
EP
CUSTOMER, PLANT:
Yaya Oil Refinery
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elementary Sulfur Recovery Unit
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Orsk Oil Refinery
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elementary Sulfur Recovery Complex
ACTIVITIES:
E
CUSTOMER, PLANT:
Syzran Oil Refinery
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Fluorhydric alkylation Complex
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Stavrolen
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamping of ethyleme-propylene plant
ACTIVITIES:
E
CUSTOMER, PLANT:
Ryazan NPK
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elementary Sulfur Recovery Complex
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Delayed coking unit with output 2 mln ton per year
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Hydrogen Production Unit with output 180 thousand ton per year. Oil refining and petrochemical complex
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sour water stripping and elementary sulfur recovery unit, with output 128 thousand ton of sulfur per year
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Linear alfa-olefins production unit with output 50 thousand ton per year
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
MEG production complex with output 700 thousand ton per year. Oil refining and petrochemical complex.
ACTIVITIES:
EPs
CUSTOMER, PLANT:
ROSNEFT – Eastern Petrochemical company
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Pyrolysis unit with output 3.4 mln ton per year. Oil refining and petrochemical complex
ACTIVITIES:
EPs
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of the infrastructure of a group of wells for TPE LUKOIL-Ukhtaneftegaz from 2014 through to 2015:
- Development of the infrastructure of a group of wells №№ 233, 209bis, 155 at Kyrtayelskoye oil field
- Development of the infrastructure of a group of wells №№ 566, 583, 2 at Michayuskoye oil field (investment project code – U028A0792A)
- Development of the infrastructure of a group of wells № 61 at Pashninsky oil field
- Development of the infrastructure of a group of wells №№ 2, 4, 8, 28р at South-Lyzhsky oil field
- Development of Ras’yuskoye oil field infrastructure for the period of commercial production. Group of wells №№ 30, 32
Formation pressure maintenance system
- Early works associated with the development of design documentation for the construction of production and injection wells at South-Kyrtayelskoye oil field (Group of wells № 402)
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of the infrastructure of a group of wells №7 at East-Sarutayuskoye oil field
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2014 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
35/10kV Substation for temporary power supply required during the construction of oil field infrastructure facilities at the oil field named after Y. Rossikhin
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL - West Siberia
YEAR:
2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of detailed design documentation, manufacturing and supply of the water injection pump station
ACTIVITIES:
EP
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Packaged recycle water cooling unit at East Lambeyshor crude oil processing facility
ACTIVITIES:
EP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
NK Bashneft, Ufa Oil Refinery 2014 - 2017 Construction of Elementary Sulfur Recovery Unit
Регион, страна: Ufa Oil Refinery, Russia
EP
Yaya Oil Refinery 2014 - till present time Elementary Sulfur Recovery Unit
Регион, страна: Russia
EPs
Orsk Oil Refinery 2014 - till present time Elementary Sulfur Recovery Complex
Регион, страна: Russia
E
Syzran Oil Refinery 2014 - till present time Fluorhydric alkylation Complex
Регион, страна: Russia
E
LUKOIL-Stavrolen 2014 - till present time Revamping of ethyleme-propylene plant
Регион, страна: Russia
E
Ryazan NPK 2014 - till present time Elementary Sulfur Recovery Complex
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time Delayed coking unit with output 2 mln ton per year
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time Hydrogen Production Unit with output 180 thousand ton per year. Oil refining and petrochemical complex
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time Sour water stripping and elementary sulfur recovery unit, with output 128 thousand ton of sulfur per year
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time Linear alfa-olefins production unit with output 50 thousand ton per year
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time MEG production complex with output 700 thousand ton per year. Oil refining and petrochemical complex.
Регион, страна: Russia
EPs
ROSNEFT – Eastern Petrochemical company 2014 - till present time Pyrolysis unit with output 3.4 mln ton per year. Oil refining and petrochemical complex
Регион, страна: Russia
EPs
LUKOIL-Komi 2014 - till present time Development of the infrastructure of a group of wells for TPE LUKOIL-Ukhtaneftegaz from 2014 through to 2015:
- Development of the infrastructure of a group of wells №№ 233, 209bis, 155 at Kyrtayelskoye oil field
- Development of the infrastructure of a group of wells №№ 566, 583, 2 at Michayuskoye oil field (investment project code – U028A0792A)
- Development of the infrastructure of a group of wells № 61 at Pashninsky oil field
- Development of the infrastructure of a group of wells №№ 2, 4, 8, 28р at South-Lyzhsky oil field
- Development of Ras’yuskoye oil field infrastructure for the period of commercial production. Group of wells №№ 30, 32
Formation pressure maintenance system
- Early works associated with the development of design documentation for the construction of production and injection wells at South-Kyrtayelskoye oil field (Group of wells № 402)
Регион, страна: Russia
E
LUKOIL-Komi 2014 - till present time Development of the infrastructure of a group of wells №7 at East-Sarutayuskoye oil field
Регион, страна: Russia
E
LUKOIL-Komi 2014 - till present time 35/10kV Substation for temporary power supply required during the construction of oil field infrastructure facilities at the oil field named after Y. Rossikhin
Регион, страна: Russia
E
LUKOIL - West Siberia 2014 Development of detailed design documentation, manufacturing and supply of the water injection pump station
Регион, страна: Russia
EP
LUKOIL-Komi 2014 Packaged recycle water cooling unit at East Lambeyshor crude oil processing facility
Регион, страна: Russia
EP
2013
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
2013 - 0
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Sulfur Recovery Unit for Hydrocracking Complex
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Nizhegorodnefteorgsynthez
YEAR:
2013 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Hydrogen Production Unit for Hydrocracking Complex of Heavy Oil Residues
ACTIVITIES:
E
CUSTOMER, PLANT:
ANTIPINSKIY Oil Refinery
YEAR:
2013 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Motor Gasoline Blending Unit
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2013 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Oil and Gas Recovery - Wells No.21, 21a, 1p, 22 Eastern Saratayu oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2013 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Oil and Gas Recovery - Well-pads No.301/ 304 of Rossihina oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Nizhegorodnefteorgsynthez
YEAR:
2013 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Regeneration Flue Gas Treatment from Catalytic Dust, Sox; Wastewater Treatment for KKK-2
ACTIVITIES:
EP
CUSTOMER, PLANT:
Rosneft-Angarsk Plymer Plant
YEAR:
2013 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamping of ethylene-propylene plant
ACTIVITIES:
EPs
CUSTOMER, PLANT:
TAIF NK Refinery
YEAR:
2013 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamping of sulfur recovery unit
ACTIVITIES:
E
CUSTOMER, PLANT:
Afipsky Refinery
YEAR:
2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of the combined plant vacuum distillation and visbreaking unit
ACTIVITIES:
EPC
CUSTOMER, PLANT:
TOTAL – GSE
YEAR:
2013 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Development of Kharyaga oilfield
ACTIVITIES:
EPs
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2013 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Retrofit of gas facilities at the Power Supply Complex of South Hilchuyu
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Permnefteorgsintez
YEAR:
2013 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Engineering and supply of equipment for the sulphur granulation and packaging unit with a capacity of 72 thousand tons/year – 1 set of equipment
ACTIVITIES:
EP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Mozyr Oil Refinery 2013 - till present time Sulfur Recovery Unit for Hydrocracking Complex
Регион, страна: Belarus
E
LUKOIL-Nizhegorodnefteorgsynthez 2013 - 2014 Hydrogen Production Unit for Hydrocracking Complex of Heavy Oil Residues
Регион, страна: Russia
E
ANTIPINSKIY Oil Refinery 2013 - till present time Motor Gasoline Blending Unit
Регион, страна: Russia
E
LUKOIL-Komi 2013 - till present time Oil and Gas Recovery - Wells No.21, 21a, 1p, 22 Eastern Saratayu oilfield
Регион, страна: Russia
E
LUKOIL-Komi 2013 - till present time Oil and Gas Recovery - Well-pads No.301/ 304 of Rossihina oilfield
Регион, страна: Russia
E
LUKOIL-Nizhegorodnefteorgsynthez 2013 - 2014 Regeneration Flue Gas Treatment from Catalytic Dust, Sox; Wastewater Treatment for KKK-2
Регион, страна: Russia
EP
Rosneft-Angarsk Plymer Plant 2013 - till present time Revamping of ethylene-propylene plant
Регион, страна: Russia
EPs
TAIF NK Refinery 2013 - 2014 Revamping of sulfur recovery unit
Регион, страна: Russia
E
Afipsky Refinery 2013 Construction of the combined plant vacuum distillation and visbreaking unit
Регион, страна: Russia
EPC
TOTAL – GSE 2013 - till present time Development of Kharyaga oilfield
Регион, страна: Russia
EPs
LUKOIL-Komi 2013 - 2014 Retrofit of gas facilities at the Power Supply Complex of South Hilchuyu
Регион, страна: Russia
E
LUKOIL-Permnefteorgsintez 2013 - 2014 Engineering and supply of equipment for the sulphur granulation and packaging unit with a capacity of 72 thousand tons/year – 1 set of equipment
Регион, страна: Russia
EP
2012
CUSTOMER, PLANT:
Rosneft Novokuybishev Catalyst Plant
YEAR:
2012 - 2016
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Catalyst regeneration complex, under license of Porocell company
ACTIVITIES:
E
CUSTOMER, PLANT:
Afipsky Refinery
YEAR:
2012 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of sulfur recovery unit with ARU and SWS units
ACTIVITIES:
EPs
CUSTOMER, PLANT:
LUKOIL-Nizhegorodnefteorgsynthez
YEAR:
2012 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sour water stripping unit; supply of process equipment
ACTIVITIES:
EP
CUSTOMER, PLANT:
Gazpromneft Omsk Refinery
YEAR:
2012
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
AVT-10 crude distillation. Revamp of heating system. Revamp of vacuum system
ACTIVITIES:
E
CUSTOMER, PLANT:
Antipinsky oil refinery
YEAR:
2012 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Storage of LPG with the tank trucks loading unit
ACTIVITIES:
EPs
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2012 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of Eastern Saratayu oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2012 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of Rossihina oilfield
ACTIVITIES:
E
CUSTOMER, PLANT:
Nothern Kuzbass oil refinery
YEAR:
2012 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Section 600. Amine regeneration unit, sour water stripper, sulfur recovery unit, sulfur degassing, sulfur granulation
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Tuapse Oil Refinery
YEAR:
2012 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Combined unit KU-3. Unit 672-10, sections: Sulfur recovery unit, Tail gas treating unit, Liquid sulfur degassing unit
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Ryazan NPK
YEAR:
2012 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of Claus SRU with sulfur storage and loading facilities and operation support
ACTIVITIES:
E
CUSTOMER, PLANT:
Afipskiy Oil Refinery
YEAR:
2012 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of SRU with amine regeneration and SWS units
ACTIVITIES:
E
CUSTOMER, PLANT:
RN-Komsomolsk Oil Refinery
YEAR:
2012 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Engineering and supply of granulation equipment with a capacity of 25 thousand tons/year – 1 set of equipment
ACTIVITIES:
EP
CUSTOMER, PLANT:
Achinsk Refinery
YEAR:
2012 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Supply of high pressure separators - 5 sets of equipment
ACTIVITIES:
P
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Rosneft Novokuybishev Catalyst Plant 2012 - 2016 Catalyst regeneration complex, under license of Porocell company
Регион, страна: Russia
E
Afipsky Refinery 2012 - 2013 Construction of sulfur recovery unit with ARU and SWS units
Регион, страна: Russia
EPs
LUKOIL-Nizhegorodnefteorgsynthez 2012 - 2014 Sour water stripping unit; supply of process equipment
Регион, страна: Russia
EP
Gazpromneft Omsk Refinery 2012 AVT-10 crude distillation. Revamp of heating system. Revamp of vacuum system
Регион, страна: Russia
E
Antipinsky oil refinery 2012 - 2014 Storage of LPG with the tank trucks loading unit
Регион, страна: Russia
EPs
LUKOIL-Komi 2012 - till present time Construction of Eastern Saratayu oilfield
Регион, страна: Russia
E
LUKOIL-Komi 2012 - till present time Construction of Rossihina oilfield
Регион, страна: Russia
E
Nothern Kuzbass oil refinery 2012 - till present time Section 600. Amine regeneration unit, sour water stripper, sulfur recovery unit, sulfur degassing, sulfur granulation
Регион, страна: Russia
EPs
Tuapse Oil Refinery 2012 - 2014 Combined unit KU-3. Unit 672-10, sections: Sulfur recovery unit, Tail gas treating unit, Liquid sulfur degassing unit
Регион, страна: Russia
EPsP
Ryazan NPK 2012 - till present time Construction of Claus SRU with sulfur storage and loading facilities and operation support
Регион, страна: Russia
E
Afipskiy Oil Refinery 2012 - 2013 Construction of SRU with amine regeneration and SWS units
Регион, страна: Russia
E
RN-Komsomolsk Oil Refinery 2012 - 2014 Engineering and supply of granulation equipment with a capacity of 25 thousand tons/year – 1 set of equipment
Регион, страна: Russia
EP
Achinsk Refinery 2012 - 2013 Supply of high pressure separators - 5 sets of equipment
Регион, страна: Russia
P
2011
CUSTOMER, PLANT:
Chemie Anlagenbau Chamnitz (CAC) Germany For Refineria del Pacifico (Manabi, Equador)
YEAR:
2011
COUNTRY, REGION:
Equador
NAME OF PROJECT, PLANT:
Construction of Sulfur recovery unit and tail gas cleaning unit for new refinery
ACTIVITIES:
E
CUSTOMER, PLANT:
Kuybishev Oil Refinery
YEAR:
2011 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Spent sulfuric acid regeneration unit
ACTIVITIES:
EP
CUSTOMER, PLANT:
Neftegorsk Gas Processing Plant (GPP)
YEAR:
2011 - 2012
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Neftegorsk GPP modification. Amine treatment unit, associated petroleum gas and hydrocarbon liquids drying and treatment unit
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi PechorNIPIneft
YEAR:
2011 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
East-Lambeishorskoye oilfield construction. "East Lambeishor" oil treatment plant.
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Angarsk Petrochemical Company
YEAR:
2011 - 2013
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Engineering and supply of reactor equipment – 1 set of equipment
ACTIVITIES:
EP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Chemie Anlagenbau Chamnitz (CAC) Germany For Refineria del Pacifico (Manabi, Equador) 2011 Construction of Sulfur recovery unit and tail gas cleaning unit for new refinery
Регион, страна: Equador
E
Kuybishev Oil Refinery 2011 - 2013 Spent sulfuric acid regeneration unit
Регион, страна: Russia
EP
Neftegorsk Gas Processing Plant (GPP) 2011 - 2012 Neftegorsk GPP modification. Amine treatment unit, associated petroleum gas and hydrocarbon liquids drying and treatment unit
Регион, страна: Russia
E
LUKOIL-Komi PechorNIPIneft 2011 - 2013 East-Lambeishorskoye oilfield construction. "East Lambeishor" oil treatment plant.
Регион, страна: Russia
EPsP
Angarsk Petrochemical Company 2011 - 2013 Engineering and supply of reactor equipment – 1 set of equipment
Регион, страна: Russia
EP
2010
CUSTOMER, PLANT:
BYKOVOGAZ («Intensification and PNP» production enhancement)
YEAR:
2010 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of South-Kislovsky gas condensate field with central processing facility
ACTIVITIES:
E
CUSTOMER, PLANT:
Syzran Oil Refinery
YEAR:
2010 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Catalytic cracking complex. Sour water stripping unit
ACTIVITIES:
E
CUSTOMER, PLANT:
Syzran Oil Refinery
YEAR:
2010 - 0
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Vacuum gasoil hydrotreating complex. Elemental sulfur recovery unit
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
PechorNIPIneft
YEAR:
2010 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Bayandysskoye oil field construction for complete development (Nizhnefamenskaya and coal fields). Oil treatment plant
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Kuybishev Oil Refinery
YEAR:
2010 - 2016
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elemental sulfur recovery system as part of catalytic cracking complex
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Novokuybishev Oil Refinery
YEAR:
2010 - 2015
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elemental sulfur recovery system as part of catalytic cracking complex
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
2010 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Tail gas cleanup block of elemental sulfur recovery unit
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Orenburgneft, a TNK-BP company
YEAR:
2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Storage-house for block sulfur at CPF site "Pokrovskaya"
ACTIVITIES:
E
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Liquid sulfur storage tank
ACTIVITIES:
E
CUSTOMER, PLANT:
TAIF-NK
YEAR:
2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit survey, release of engineering solutions for work process improvement, upgrading of equipment operation and increase in efficiency
ACTIVITIES:
E
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of transformer substation
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
BYKOVOGAZ («Intensification and PNP» production enhancement) 2010 - till present time Construction of South-Kislovsky gas condensate field with central processing facility
Регион, страна: Russia
E
Syzran Oil Refinery 2010 - till present time Catalytic cracking complex. Sour water stripping unit
Регион, страна: Russia
E
Syzran Oil Refinery 2010 - till present time Vacuum gasoil hydrotreating complex. Elemental sulfur recovery unit
Регион, страна: Russia
EPsP
PechorNIPIneft 2010 - 2014 Bayandysskoye oil field construction for complete development (Nizhnefamenskaya and coal fields). Oil treatment plant
Регион, страна: Russia
EPsP
Kuybishev Oil Refinery 2010 - 2016 Elemental sulfur recovery system as part of catalytic cracking complex
Регион, страна: Russia
EPsP
Novokuybishev Oil Refinery 2010 - 2015 Elemental sulfur recovery system as part of catalytic cracking complex
Регион, страна: Russia
EPsP
Moscow Oil Refinery 2010 - 2014 Tail gas cleanup block of elemental sulfur recovery unit
Регион, страна: Russia
EPs
Orenburgneft, a TNK-BP company 2010 Storage-house for block sulfur at CPF site "Pokrovskaya"
Регион, страна: Russia
E
Kirishinefteorgsintez 2010 Liquid sulfur storage tank
Регион, страна: Russia
E
TAIF-NK 2010 Sulfur recovery unit survey, release of engineering solutions for work process improvement, upgrading of equipment operation and increase in efficiency
Регион, страна: Russia
E
Moscow Oil Refinery 2010 Revamp of transformer substation
Регион, страна: Russia
E
2009
CUSTOMER, PLANT:
Lukoil – Volgogradneftegaz
YEAR:
2009 - 2012
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Booster compression station modification at CPF site "Alekseevskaya"
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2009 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Acid water recovery system and transfer systems. Design of acid wastes stripping unit
ACTIVITIES:
E
CUSTOMER, PLANT:
TANECO
YEAR:
2009 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Combined sulfur recovery unit in complex of oil refining and petrochemical plants
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2009 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit and amine regeneration with tail gas cleanup unit (installation 672-20) of deep conversion plant within the LLC "KINEF"
ACTIVITIES:
E
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
2009 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit and liquid sulfur loading rack into rail tank car as a part of combined gas sweetening plant, amine regeneration and elemental sulfur recovery, JSC Moscow Oil Refinery
ACTIVITIES:
E
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2009
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Additional racks for liquid sulfur loading into rail tank car of plant 672-20, Deep conversion plant LLC "KINEF"
ACTIVITIES:
E
CUSTOMER, PLANT:
Naryanmarneftegaz
YEAR:
2009 - 2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Hookup of sulfur granulation unit, "Yuzhnaya Khylchuyu", CPF site
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
2009 - 2014
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Reclamation facility for sulfurous gas and sulfur granules production as a part of hydrocracking complex JSC "Achinskiy NPZ VNK"
ACTIVITIES:
EPsP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Lukoil – Volgogradneftegaz 2009 - 2012 Booster compression station modification at CPF site "Alekseevskaya"
Регион, страна: Russia
EPs
Kirishinefteorgsintez 2009 - 2011 Acid water recovery system and transfer systems. Design of acid wastes stripping unit
Регион, страна: Russia
E
TANECO 2009 - 2011 Combined sulfur recovery unit in complex of oil refining and petrochemical plants
Регион, страна: Russia
EPs
Kirishinefteorgsintez 2009 - 2011 Sulfur recovery unit and amine regeneration with tail gas cleanup unit (installation 672-20) of deep conversion plant within the LLC "KINEF"
Регион, страна: Russia
E
Moscow Oil Refinery 2009 - 2011 Revamp of sulfur recovery unit and liquid sulfur loading rack into rail tank car as a part of combined gas sweetening plant, amine regeneration and elemental sulfur recovery, JSC Moscow Oil Refinery
Регион, страна: Russia
E
Kirishinefteorgsintez 2009 Additional racks for liquid sulfur loading into rail tank car of plant 672-20, Deep conversion plant LLC "KINEF"
Регион, страна: Russia
E
Naryanmarneftegaz 2009 - 2010 Hookup of sulfur granulation unit, "Yuzhnaya Khylchuyu", CPF site
Регион, страна: Russia
EPs
Achinskiy Oil Refinery 2009 - 2014 Reclamation facility for sulfurous gas and sulfur granules production as a part of hydrocracking complex JSC "Achinskiy NPZ VNK"
Регион, страна: Russia
EPsP
2008
CUSTOMER, PLANT:
Tatneft
YEAR:
2009 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur removal facility at Minibaevskaya Central Production Facility, Administration "Tatneftegazpererabotka". Sulfur recovery unit 400N and liquid sulfur granulation 600.
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
2009 - 2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sour water stripper by furnace for sour gas recovery "SWS"
ACTIVITIES:
E
CUSTOMER, PLANT:
Naryanmarneftegaz
YEAR:
2008 - 2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening plant, sulfur recovery unit including equipment supply, II stage. Block-modular steam boiler plant
ACTIVITIES:
EP
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
2008 - 2009
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit №2 and liquid sulfur loading rack into rail tank car within combined gas sweetening plant, MEA regeneration and elemental sulfur recovery (Oxygen enrichment)
ACTIVITIES:
E
CUSTOMER, PLANT:
LUKOIL-Komi
YEAR:
2008
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Tatneft 2009 - 2011 Revamp of Sulfur removal facility at Minibaevskaya Central Production Facility, Administration "Tatneftegazpererabotka". Sulfur recovery unit 400N and liquid sulfur granulation 600.
Регион, страна: Russia
EPs
Achinskiy Oil Refinery 2009 - 2010 Sour water stripper by furnace for sour gas recovery "SWS"
Регион, страна: Russia
E
Naryanmarneftegaz 2008 - 2010 Gas sweetening plant, sulfur recovery unit including equipment supply, II stage. Block-modular steam boiler plant
Регион, страна: Russia
EP
Mozyr Oil Refinery 2008 - 2009 Revamp of Sulfur recovery unit №2 and liquid sulfur loading rack into rail tank car within combined gas sweetening plant, MEA regeneration and elemental sulfur recovery (Oxygen enrichment)
Регион, страна: Belarus
E
LUKOIL-Komi 2008 Sulfur recovery unit
Регион, страна: Russia
E
2007
CUSTOMER, PLANT:
LUKOIL-Nizhegorodnefteorgsintez
YEAR:
2007 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Combined elemental sulfur recovery plant
ACTIVITIES:
EPsP
CUSTOMER, PLANT:
Naryanmarneftegaz
YEAR:
2008 - 2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Block-modular steam boiler plant
ACTIVITIES:
EP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
LUKOIL-Nizhegorodnefteorgsintez 2007 - 2011 Combined elemental sulfur recovery plant
Регион, страна: Russia
EPsP
Naryanmarneftegaz 2008 - 2010 Block-modular steam boiler plant
Регион, страна: Russia
EP
2006
CUSTOMER, PLANT:
Naryanmarneftegaz
YEAR:
2006 - 2007
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening plant, sulfur recovery plant and sulfur storage facility on the "Yuzhnaya Khylchuyu" CPF site, I stage. Block-modular steam boiler plant
ACTIVITIES:
EPCM
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
2006 - 2007
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elemental sulfur recovery and sulfur granulation plants
ACTIVITIES:
EPC
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Naryanmarneftegaz 2006 - 2007 Gas sweetening plant, sulfur recovery plant and sulfur storage facility on the "Yuzhnaya Khylchuyu" CPF site, I stage. Block-modular steam boiler plant
Регион, страна: Russia
EPCM
Achinskiy Oil Refinery 2006 - 2007 Elemental sulfur recovery and sulfur granulation plants
Регион, страна: Russia
EPC
2005
CUSTOMER, PLANT:
Saratov Oil Refinery
YEAR:
2005
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit
ACTIVITIES:
E
CUSTOMER, PLANT:
Temir Pipe
YEAR:
2005
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Gas treatment plant
ACTIVITIES:
EP
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2005 - 2010
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit with increase of capacities and environmental performance
ACTIVITIES:
EPsP
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Saratov Oil Refinery 2005 Revamp of sulfur recovery unit
Регион, страна: Russia
E
Temir Pipe 2005 Gas treatment plant
Регион, страна: Kazakstan
EP
Kirishinefteorgsintez 2005 - 2010 Revamp of Sulfur recovery unit with increase of capacities and environmental performance
Регион, страна: Russia
EPsP
2004
CUSTOMER, PLANT:
Joint venture Kazpolmunaj
YEAR:
2004 - 2005
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur recovery unit in Gas field "Barankol"
ACTIVITIES:
E
CUSTOMER, PLANT:
Saratov Oil refinery
YEAR:
2004 - 2005
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of converters block of sulfur recovery unit
ACTIVITIES:
E
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
2004 - 2006
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
MEA regeneration unit. Works on corrosion protection of Alkylation Complex
ACTIVITIES:
E
CUSTOMER, PLANT:
Lukoil - Volgogradneftepererabontka
YEAR:
2004
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
E
CUSTOMER, PLANT:
Lukoil-Nizhnevolzhskneft
YEAR:
2004 - 2005
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Associated gas treatment plant: design of associated gas treatment plant, dehydration process of natural gas at CS "Kudinovka"
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Joint venture Kazpolmunaj 2004 - 2005 Sulfur recovery unit in Gas field "Barankol"
Регион, страна: Kazakstan
E
Saratov Oil refinery 2004 - 2005 Revamp of converters block of sulfur recovery unit
Регион, страна: Russia
E
Mozyr Oil Refinery 2004 - 2006 MEA regeneration unit. Works on corrosion protection of Alkylation Complex
Регион, страна: Belarus
E
Lukoil - Volgogradneftepererabontka 2004 Sulfur recovery unit
Регион, страна: Russia
E
Lukoil-Nizhnevolzhskneft 2004 - 2005 Associated gas treatment plant: design of associated gas treatment plant, dehydration process of natural gas at CS "Kudinovka"
Регион, страна: Russia
E
2003
CUSTOMER, PLANT:
Tatneft
YEAR:
2003
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit at Minibaevskaya Central Production Facility, Administration "Tatneftegazpererabotka"
ACTIVITIES:
E
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
2003
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery with tail gas treatment and MDEA regeneration units
ACTIVITIES:
E
CUSTOMER, PLANT:
Lukoil-Nizhnevolzhskneft
YEAR:
2003 - 2005
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Wellhead completion and location construction of field left group of booster pipeline pumping station "Alekseevskaya". Treatment and flash gas compression plant
ACTIVITIES:
EPC
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Tatneft 2003 Revamp of Sulfur recovery unit at Minibaevskaya Central Production Facility, Administration "Tatneftegazpererabotka"
Регион, страна: Russia
E
Slavneft-Yaroslavnefteorgsintez 2003 Sulfur recovery with tail gas treatment and MDEA regeneration units
Регион, страна: Russia
E
Lukoil-Nizhnevolzhskneft 2003 - 2005 Wellhead completion and location construction of field left group of booster pipeline pumping station "Alekseevskaya". Treatment and flash gas compression plant
Регион, страна: Russia
EPC
2002
CUSTOMER, PLANT:
Mazeiku Nafta
YEAR:
2002
COUNTRY, REGION:
Lithuania
NAME OF PROJECT, PLANT:
Revamp of block 1 and block 2 of elemental sulfur recovery units
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Lukoil Neftochim Burgas
YEAR:
2002
COUNTRY, REGION:
Bulgaria
NAME OF PROJECT, PLANT:
Revamp of elemental sulfur recovery unit, including new block and 2 blocks being reconstructed at Oil Refinery plant "Burgas"
ACTIVITIES:
E
CUSTOMER, PLANT:
Baitek-Silur, CJSC
YEAR:
2002
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Associated gas treatment unit, field of project "Parma"
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Mazeiku Nafta 2002 Revamp of block 1 and block 2 of elemental sulfur recovery units
Регион, страна: Lithuania
EPs
Lukoil Neftochim Burgas 2002 Revamp of elemental sulfur recovery unit, including new block and 2 blocks being reconstructed at Oil Refinery plant "Burgas"
Регион, страна: Bulgaria
E
Baitek-Silur, CJSC 2002 Associated gas treatment unit, field of project "Parma"
Регион, страна: Russia
E
2001
CUSTOMER, PLANT:
North Liman field
YEAR:
2001
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur removal facility and sulfur recovery unit, II stage
ACTIVITIES:
E
CUSTOMER, PLANT:
Mazeiku Nafta
YEAR:
2001 - 2003
COUNTRY, REGION:
Lithuania
NAME OF PROJECT, PLANT:
Modernization of 4 blocks of two sulfur recovery units
ACTIVITIES:
EPs
CUSTOMER, PLANT:
Kirishinefteorgsintez
YEAR:
2001 - 2011
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and amine regeneration units within the scope of hydrocracker complex with tail gas treatment unit, Kirishinefteorgsintez plant
ACTIVITIES:
EPs
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
North Liman field 2001 Sulfur removal facility and sulfur recovery unit, II stage
Регион, страна: Russia
E
Mazeiku Nafta 2001 - 2003 Modernization of 4 blocks of two sulfur recovery units
Регион, страна: Lithuania
EPs
Kirishinefteorgsintez 2001 - 2011 Sulfur recovery and amine regeneration units within the scope of hydrocracker complex with tail gas treatment unit, Kirishinefteorgsintez plant
Регион, страна: Russia
EPs
2000
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
2000
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
E
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
2000
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of gas sweetening plant, II stage for gas processing at Karachaganak field with a capacity of 2.5 bln.m3/yr
ACTIVITIES:
E
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
2000 - 2004
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Revamp of amine regeneration unit (1 and 2 blocks) and sulfur recovery units (1 and 2 blocks). Design of new blocks of MEA regeneration and sulfur recovery
ACTIVITIES:
EPs
CUSTOMER, PLANT:
KazMunaiGaz Oil Company
YEAR:
2000
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Gas sweetening plant from mercaptans
ACTIVITIES:
E
CUSTOMER, PLANT:
Lukoil - Volgogradneftepererabontka
YEAR:
2000
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Liquid sulfur discharge facilities within plant 161
ACTIVITIES:
E
CUSTOMER, PLANT:
Achinskiy oil recovery
YEAR:
2000
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
MEA regeneration unit
ACTIVITIES:
E
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Slavneft-Yaroslavnefteorgsintez 2000 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
E
Orenburg gas processing plant 2000 Revamp of gas sweetening plant, II stage for gas processing at Karachaganak field with a capacity of 2.5 bln.m3/yr
Регион, страна: Russia
E
Mozyr Oil Refinery 2000 - 2004 Revamp of amine regeneration unit (1 and 2 blocks) and sulfur recovery units (1 and 2 blocks). Design of new blocks of MEA regeneration and sulfur recovery
Регион, страна: Belarus
EPs
KazMunaiGaz Oil Company 2000 Gas sweetening plant from mercaptans
Регион, страна: Kazakstan
E
Lukoil - Volgogradneftepererabontka 2000 Liquid sulfur discharge facilities within plant 161
Регион, страна: Russia
E
Achinskiy oil recovery 2000 MEA regeneration unit
Регион, страна: Russia
E
1960-2000
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
1999
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Revamp of waste heat boiler facilities S-2-II of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Aktobemunaigaz
YEAR:
1998 - 1999
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Revamp of Sulfur removal facility and sulfur recovery in Zhanazholsky field with bringing capacity to 3 mln.tons./yr
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Lukoil - Volgogradneftepererabontka
YEAR:
1995 - 1999
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Modernization of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Lukoil-Permnefteorgsintez
YEAR:
1995 - 1998
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
1994
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Design of sulfur recovery and tail gas treatment units, including MEA regeneration unit, 2 process lines of sulfur recovery, tail gas cleanup Claus process
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1994
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Mercaptan separation plant
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1994
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Routing of service gas between sulfur coalescers and incinerators on sulfur unit of 1 stage and import block
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Kirishsky Oil refinery
YEAR:
1994
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Construction of deep conversion plant. Elemental Sulfur recovery and rich DEA regeneration unit
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1993
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of "Sulfren" process unit for operation in mode of "cold layer", III stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1993
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Plant: flash gas sweetening, III and IV stages; dehydration of flash gases. Revamp of Automatic Process Control System for I-IV stages of gas sweetening and sulfur recovery plants
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1993
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Zeolite-based removal plant, 4-th block (24 bln.m3/yr), 6-th block
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1992
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur degassing unit in continuous operation using scrubber chamber, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1992
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Zeolite-based sulfur removal plant, 5-th block
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Lisichansk Oil refinery
YEAR:
1992
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Tail Gas Clean-up and sulfur recovery units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kirishsky Oil refinery
YEAR:
1992
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit within deep conversion plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Astrakhan gas processing plant
YEAR:
1992
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of gas sweetening plant and "Claus" tail gas cleanup, II stage
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1991
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit 50-II. Sulfur recovery unit 70-II by "Claus" methods and direct oxidation. Tail gas cleanup plant by "Sulfren" method, 2-th block, IV stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kokdumalak field
YEAR:
1991
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Zeolite-based gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1991
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
MEA regeneration unit, I stage
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Fergana Oil Refinery
YEAR:
1990
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Ufimsky Oil Refinery
YEAR:
1990
COUNTRY, REGION:
Bashkortostan, Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
1990
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
North Liman field
YEAR:
1990
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur removal and sulfur recovery unit, I stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1990
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Expansion and revamp of Sulfur recovery unit, I and II stages
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Omsk Oil Refinery
YEAR:
1990
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit. TCS of tail gas treating unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1990
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Tail gas treating unit, 1th Sulfur recovery unit, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Mangishlaksy Oil Refinery
YEAR:
990
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Astrakhan gas processing plant
YEAR:
1990
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit with tail gas cleanup, II stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
San-Fuegos, Oil Refinery
YEAR:
1989
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Sulfur recovery and DEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Omsk Oil Refinery
YEAR:
1989
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units within complex of КТ-1/1
ACTIVITIES:
Approvals package, working documentation, including non-standardized equipment, construction design supervision
CUSTOMER, PLANT:
Novo-bakinsky Oil Refinery
YEAR:
1989
COUNTRY, REGION:
Azerbaijan
NAME OF PROJECT, PLANT:
MEA regeneration and Sulfur recovery units from TCS of tail gas cleanup
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
1989
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Amine regeneration and sulfur recovery units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1989
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of existing amine gas sweetening, design of additional one
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1989
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of regeneration and sulfur recovery units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Tengiz oil field
YEAR:
1988
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur removal facility, sulfur recovery and tail gas treating, I stage. Additional tail gas clean-up unit, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Saratov Oil Refinery
YEAR:
1988
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1988
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Expansion and revamp of tail gas cleanup unit, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Oil Refinery in Karnal
YEAR:
1988
COUNTRY, REGION:
India
NAME OF PROJECT, PLANT:
MEA regeneration unit Sulfur recovery unit with sulfur storeroom
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1988
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
"Claus" Tail gas cleanup unit, gas sweetening plant, IV stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Minnefteprom
YEAR:
1988
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
TCS of tail gas cleanup and revamp of Sulfur recovery unit I and II stages. Sulfur removal facility and sulfur recovery at Zhanazholsky field
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Yuzhnoye Khylchuyu field
YEAR:
1987
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Petroleum gas treatment unit for removing H2S with sulfur recovery
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Tengiz oil field
YEAR:
1987
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur removal facility, sulfur recovery and Tail Gas Clean-up II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
1987
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur dioxide plant by hydrogen to H2S on alumina-cobalt-molybdenum catalyst agent
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Lisichansk Oil Refinery
YEAR:
1987
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
San-Fuegos, Oil Refinery
YEAR:
1986
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Sulfur recovery and DEA regeneration units, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1986
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of gas sweetening plant, sulfur recovery and tail gas treating, IV stage. Revamp of Tail Gas Treatment Units, II stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Djar Kuduk gas field
YEAR:
1986
COUNTRY, REGION:
North Afghanistan
NAME OF PROJECT, PLANT:
Revamp of gas treatment unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1985
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1985
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Natural gas-sweetening plant on solid sorbents, III block, including gas sweetening
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1985
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Hermanos Diaz Oil refinery
YEAR:
1984
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Sulfur recovery and DEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Ukhtinsky Oil Refinery
YEAR:
1984
COUNTRY, REGION:
Bashkortostan, Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Ufimsky Oil Refinery
YEAR:
1984
COUNTRY, REGION:
Bashkortostan, Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Sovetobad gas field
YEAR:
1984
COUNTRY, REGION:
Turkmenistan
NAME OF PROJECT, PLANT:
Amine Plant with commercial production of sulfur, 5 bln.m3/yr
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
1984
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Otradnensky gas processing plant
YEAR:
1984
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit, I stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1984
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery and tail gas treatment units, III stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1984
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Expansion of gas production to 25 bln.m3/yr, IV stage. Automatic Process Control System of low sulfurous gas treatment plant, at Zaverdy field
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Lukoil-Permnefteorgsintez
YEAR:
1984
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Elemental sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Slavneft-Yaroslavnefteorgsintez
YEAR:
1984
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1983
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Nizhnekamsk Oil Refinery
YEAR:
1983
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Amine regeneration and sulfur recovery units, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1983
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Tail gas treating unit by "Sulfren" method, 1-th and 2-th blocks. Revamp of sulfur recovery unit, I stage, 4-th block
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1983
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Natural gas sweetening plant on solid sorbents, IV block, including gas sweetening
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
North Balkui field
YEAR:
1983
COUNTRY, REGION:
Turkmenistan
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Zhanazholsky field
YEAR:
1983
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur removal and sulfur recovery unit, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Lokachinskoe gas field
YEAR:
1983
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Gas sweetening plant
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Novogroznensky Oil Refinery
YEAR:
1982
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of amine regeneration and sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1982
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of natural gas sweetening shop from H2S and CO2, I stage
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Tengiz oil field
YEAR:
1981
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Gas sweetening plant and sulfur recovery, I stage. Facility complex on gas sweetening, sulfur removal facility and sulfur recovery
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1981
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Gas sweetening plant, tail gas cleanup of sulfur recovery unit, IV stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
1981
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp and expansion of sulfur removal facility, solution regeneration and sulfur recovery
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1981
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Gas sweetening and sulfur recovery unit, 16 bln.m3/yr
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Zhanazholsky field
YEAR:
1981 - 1982
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur removal facility and sulfur recovery unit, Zhanazholsky field
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Baku Oil Refinery
YEAR:
1981
COUNTRY, REGION:
Azerbaijan
NAME OF PROJECT, PLANT:
Amine regeneration plant of sulfur recovery from tail gas cleanup TCS
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Astrakhan gas processing plant
YEAR:
1981
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening and sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Niko Lopez Oil Refinery
YEAR:
1980
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery and DEA regeneration units, II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1980
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
High sulfurous gas sweetening units, tail gas cleanup of sulfur recovery units, I, II and III stages. Revamp of low sulfurous gas sweetening units, Kultaksko-Zavardinsky cluster of fields
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Kuibyishevsky Oil Refinery OWC
YEAR:
1980
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Novogroznensky Oil Refinery
YEAR:
1979
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and Amine regeneration units. Complex of secondary processes
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Volgograd Oil Refinery
YEAR:
1979
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1979
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Solution regeneration and Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Chimkent Oil Refinery
YEAR:
1978
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Treatment and recovery of low sulfurous gases
ACTIVITIES:
Working documentation, including non-standard equipment
CUSTOMER, PLANT:
Pavlodar Oil Refinery
YEAR:
1978
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Nizhnekamsk Oil Refinery
YEAR:
1978
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur utilization from atmospheric gas oil hydrodesulfurization plant and from ethylene production plant, III stage
ACTIVITIES:
Working documentation, including non-standard equipment
CUSTOMER, PLANT:
North Balkui field
YEAR:
1978
COUNTRY, REGION:
Turkmenistan
NAME OF PROJECT, PLANT:
Natural gas sweetening plant using amine method, sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Izmir Oil Refinery
YEAR:
1978
COUNTRY, REGION:
Turkey
NAME OF PROJECT, PLANT:
Amine Plant of liquefied petroleum gas. Revamp of desulfurization shop and sulfur recovery equipment, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Niko Lopez Oil Refinery
YEAR:
1977
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery and DEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1977
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Expansion of gas recovery in gas sweetening section to 15 bln.m3/yr., III stage, and Sulfur recovery from gas sweetening section to 10 bln.m3/yr. II stage
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Lisichansk Oil Refinery
YEAR:
1977
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Hermanos Diaz Oil refinery
YEAR:
1976
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
San-Fuegos, Oil Refinery
YEAR:
1976
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery and DEA regeneration units, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Nizhnekamsk Oil Refinery
YEAR:
1976
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and Amine regeneration units, II stage of petrochemical complex
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1976
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp with purpose to bring production to 15 bln.m3/yr: TCS of sulfur recovery using direct oxidation; gas sweetening section, II stage
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Shurtan gas field
YEAR:
1976
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Natural gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Lisichansk Oil Refinery
YEAR:
1976
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery and MEA regeneration units
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Buturinskoe oil field
YEAR:
1976
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Natural gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Chimkent Oil Refinery
YEAR:
1975
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Sulfur recovery and Amine regeneration units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Tuimazy oil field
YEAR:
1975
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
Associated gas sweetening plant, and sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Permsky gas processing plant
YEAR:
1975
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Otradnensky gas processing plant
YEAR:
1975
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit, II stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1975
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of gas sweetening section. TCS of sulfur recovery from low sulfurous gases by direct oxidation method. II stage of sulfur recovery
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Ukhtinsky Oil Refinery
YEAR:
1974
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit from low sulfurous gases by direct oxidation method
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
1974
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur removal facility, solution regeneration and sulfur recovery
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Danube Oil Refinery
YEAR:
1974
COUNTRY, REGION:
Bulgaria
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Djar Kuduk gas field
YEAR:
1974
COUNTRY, REGION:
North Afghanistan
NAME OF PROJECT, PLANT:
Gas sweetening unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Tissaisky Oil Refinery
YEAR:
1973
COUNTRY, REGION:
Bulgaria
NAME OF PROJECT, PLANT:
Sulfur recovery unit to remove Н2S
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Tatneft
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening unit of high-sulfur crude oil with elemental sulfur recovery, “Tatneftegas” plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Saratov Oil Refinery
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
TCS revamp of sulfur and tail gases
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1973
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of absorbers of 1-st and 2-nd stages
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit. "Dry gas" treatment unit and MEA centralized regeneration
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kirishsky Oil Refinery
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
MEA regeneration unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Djar Kuduk gas field
YEAR:
1973
COUNTRY, REGION:
North Afghanistan
NAME OF PROJECT, PLANT:
Expediency of accessing of gas field clusters containing H2S, to existing gas line system
ACTIVITIES:
Working documentation
CUSTOMER, PLANT:
Volgograd Oil Refinery
YEAR:
1973
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
"Dry gas" treatment unit, elemental sulfur recovery unit. Crude oil processing unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1972
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
TCS of tail gas cleanup and sulfur recovery
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1972
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Sulfur recovery section, I and II blocks. Revamp of sulfur recovery unit I
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kremenchug Oil Refinery
YEAR:
1972
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Revamp of process gas production. Gas sweetening and sulfur recovery units
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1972
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
MEA regeneration and Sulfur recovery units, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Pavlodarsky Oil Refinery
YEAR:
1971
COUNTRY, REGION:
Kazakstan
NAME OF PROJECT, PLANT:
MEA regeneration and sulfur recovery units, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Otradnensky gas processing plant
YEAR:
1971
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp and expansion of elemental sulfur recovery unit, II stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mazeiku Oil Refinery
YEAR:
1971
COUNTRY, REGION:
Lithuania
NAME OF PROJECT, PLANT:
Elemental sulfur recovery unit and MEA regeneration unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kremenchug Oil Refinery
YEAR:
1971
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Sulfur recovery and MEA regeneration units
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Naftan Oil Refinery
YEAR:
1971
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Sulfur recovery unit from H2S
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Almetyevneft ORP
YEAR:
1971
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp and expansion of the following plants: sulfur removal, sulfur recovery, high-sulfur crude oil associated gas sweetening with elemental sulfur recovery
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
1970
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp and expansion of sulfur removal facility and sulfur recovery
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Mozyr Oil Refinery
YEAR:
1970 - 1972
COUNTRY, REGION:
Belarus
NAME OF PROJECT, PLANT:
Amine regeneration and sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Achinskiy Oil Refinery
YEAR:
1970
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit, I stage
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Orenburg gas processing plant
YEAR:
1969
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
TCS Complex of gas and gas condensate treatment. Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Oil Refinery within Petrochemical complex, Pleven
YEAR:
1969
COUNTRY, REGION:
Bulgaria
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1969
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Revamp of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Kremenchug Oil Refinery
YEAR:
1968
COUNTRY, REGION:
Ukraine
NAME OF PROJECT, PLANT:
Sulfur recovery section from H2S. I stage of revamp and expansion of Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Permsky gas processing plant
YEAR:
1967
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Associated gas treatment. Sulfur recovery unit. Gas sweetening section
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Ungi Oil Refinery
YEAR:
1967
COUNTRY, REGION:
Korea
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Ufimsky Oil Refinery
YEAR:
1966
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Mubarek gas-processing plant
YEAR:
1966
COUNTRY, REGION:
Uzbekistan
NAME OF PROJECT, PLANT:
Sulfur recovery unit, chemical storeroom
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Izmir Oil Refinery
YEAR:
1966
COUNTRY, REGION:
Turkey
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Khabarovsk Oil Refinery
YEAR:
1965
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Saratov Oil Refinery
YEAR:
1965
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit from H2S
ACTIVITIES:
Approvals package, working documentation
CUSTOMER, PLANT:
Omsk Oil Refinery
YEAR:
1965
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas sweetening plant and oil and gas dehydration process
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Lithuanian Oil Refinery
YEAR:
1965
COUNTRY, REGION:
Lithuania
NAME OF PROJECT, PLANT:
Sulfur recovery from Н2S and MEA regeneration
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Kirishsky Oil Refinery
YEAR:
1965
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Expansion of sulfur recovery shop from H2S, II stage. Construction of I stage of sulfur recovery shop from H2S
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Ufimsky Oil Refinery
YEAR:
1964
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Revamp of lean petroleum gas sweetening plant, sulfur recovery shop and MEA plant of fraction cleanup H2+C1+C2
ACTIVITIES:
Approvals package, working documentation, construction design supervision
CUSTOMER, PLANT:
Korobkovskoe oil field
YEAR:
1964
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit from H2S
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Kirishsky Oil Refinery
YEAR:
1964
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery shop from H2S
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Kuibyshevsky Oil Refinery
YEAR:
1963
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery shop from H2S within IV stage of expansion and revamp of "Kuibyshevsky" Oil Refinery
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Chernikovsky Oil Refinery
YEAR:
1962
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Dry gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Ryazansky Oil Refinery
YEAR:
1962
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Dry gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Novo-Ufimsky Oil Refinery
YEAR:
1962
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Ryazansky Oil Refinery
YEAR:
1961
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery shop by three-stage "Claus" method
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Santiago Oil Refinery
YEAR:
1961
COUNTRY, REGION:
Cuba
NAME OF PROJECT, PLANT:
Thermal and catalytic methods of sulfur recovery unit
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Moscow Oil Refinery
YEAR:
1961
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Sulfur recovery and oil gas sweetening plants
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment, construction design supervision
CUSTOMER, PLANT:
Chernikovsky Oil Refinery
YEAR:
1960
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Dry gas sweetening plant
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Ufimsky Oil Refinery
YEAR:
1960
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas and oil gas sweetening plant by MEA methods
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Novo-Ufimsky Oil Refinery
YEAR:
1960
COUNTRY, REGION:
Russia
NAME OF PROJECT, PLANT:
Gas and liquid oil streams sweetening plant by MEA methods
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT:
Burgas Oil Refinery
YEAR:
1960
COUNTRY, REGION:
Bulgaria
NAME OF PROJECT, PLANT:
Dry gas sweetening plant by MEA methods
ACTIVITIES:
Approvals package, working documentation, including non-standard equipment
CUSTOMER, PLANT NAME OF PROJECT, PLANT ACTIVITIES
Mozyr Oil Refinery 1999 Revamp of waste heat boiler facilities S-2-II of sulfur recovery unit
Регион, страна: Belarus
Approvals package, working documentation, construction design supervision
Aktobemunaigaz 1998 - 1999 Revamp of Sulfur removal facility and sulfur recovery in Zhanazholsky field with bringing capacity to 3 mln.tons./yr
Регион, страна: Kazakstan
Approvals package, working documentation
Lukoil - Volgogradneftepererabontka 1995 - 1999 Modernization of sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Lukoil-Permnefteorgsintez 1995 - 1998 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation
Slavneft-Yaroslavnefteorgsintez 1994 Design of sulfur recovery and tail gas treatment units, including MEA regeneration unit, 2 process lines of sulfur recovery, tail gas cleanup Claus process
Регион, страна: Russia
Approvals package, working documentation
Orenburg gas processing plant 1994 Mercaptan separation plant
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Mubarek gas-processing plant 1994 Routing of service gas between sulfur coalescers and incinerators on sulfur unit of 1 stage and import block
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Kirishsky Oil refinery 1994 Construction of deep conversion plant. Elemental Sulfur recovery and rich DEA regeneration unit
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Orenburg gas processing plant 1993 Revamp of "Sulfren" process unit for operation in mode of "cold layer", III stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1993 Plant: flash gas sweetening, III and IV stages; dehydration of flash gases. Revamp of Automatic Process Control System for I-IV stages of gas sweetening and sulfur recovery plants
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Shurtan gas field 1993 Zeolite-based removal plant, 4-th block (24 bln.m3/yr), 6-th block
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Orenburg gas processing plant 1992 Sulfur degassing unit in continuous operation using scrubber chamber, I stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Shurtan gas field 1992 Zeolite-based sulfur removal plant, 5-th block
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Lisichansk Oil refinery 1992 Tail Gas Clean-up and sulfur recovery units
Регион, страна: Ukraine
Approvals package, working documentation, including non-standard equipment
Kirishsky Oil refinery 1992 Sulfur recovery unit within deep conversion plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Astrakhan gas processing plant 1992 Revamp of gas sweetening plant and "Claus" tail gas cleanup, II stage
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Mubarek gas-processing plant 1991 Revamp of Sulfur recovery unit 50-II. Sulfur recovery unit 70-II by "Claus" methods and direct oxidation. Tail gas cleanup plant by "Sulfren" method, 2-th block, IV stage
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Kokdumalak field 1991 Zeolite-based gas sweetening plant
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Achinskiy Oil Refinery 1991 MEA regeneration unit, I stage
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Fergana Oil Refinery 1990 Sulfur recovery unit
Регион, страна: Uzbekistan
Approvals package, working documentation
Ufimsky Oil Refinery 1990 Sulfur recovery and MEA regeneration units
Регион, страна: Bashkortostan, Russia
Approvals package, working documentation
Slavneft-Yaroslavnefteorgsintez 1990 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
Working documentation
North Liman field 1990 Sulfur removal and sulfur recovery unit, I stage
Регион, страна: Russia
Approvals package, working documentation
Orenburg gas processing plant 1990 Expansion and revamp of Sulfur recovery unit, I and II stages
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Omsk Oil Refinery 1990 Sulfur recovery unit. TCS of tail gas treating unit
Регион, страна: Russia
Approvals package, working documentation
Mubarek gas-processing plant 1990 Tail gas treating unit, 1th Sulfur recovery unit, I stage
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Mangishlaksy Oil Refinery 990 Sulfur recovery and MEA regeneration units
Регион, страна: Kazakstan
Approvals package, working documentation, including non-standard equipment
Astrakhan gas processing plant 1990 Revamp of Sulfur recovery unit with tail gas cleanup, II stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
San-Fuegos, Oil Refinery 1989 Sulfur recovery and DEA regeneration units
Регион, страна: Cuba
Approvals package, working documentation
Omsk Oil Refinery 1989 Sulfur recovery and MEA regeneration units within complex of КТ-1/1
Регион, страна: Russia
Approvals package, working documentation, including non-standardized equipment, construction design supervision
Novo-bakinsky Oil Refinery 1989 MEA regeneration and Sulfur recovery units from TCS of tail gas cleanup
Регион, страна: Azerbaijan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Mozyr Oil Refinery 1989 Amine regeneration and sulfur recovery units
Регион, страна: Belarus
Approvals package, working documentation
Shurtan gas field 1989 Revamp of existing amine gas sweetening, design of additional one
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Achinskiy Oil Refinery 1989 Revamp of regeneration and sulfur recovery units
Регион, страна: Russia
Approvals package, working documentation
Tengiz oil field 1988 Sulfur removal facility, sulfur recovery and tail gas treating, I stage. Additional tail gas clean-up unit, II stage
Регион, страна: Kazakstan
Approvals package, working documentation
Saratov Oil Refinery 1988 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Orenburg gas processing plant 1988 Expansion and revamp of tail gas cleanup unit, II stage
Регион, страна: Russia
Approvals package, working documentation
Oil Refinery in Karnal 1988 MEA regeneration unit Sulfur recovery unit with sulfur storeroom
Регион, страна: India
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1988 "Claus" Tail gas cleanup unit, gas sweetening plant, IV stage
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Minnefteprom 1988 TCS of tail gas cleanup and revamp of Sulfur recovery unit I and II stages. Sulfur removal facility and sulfur recovery at Zhanazholsky field
Регион, страна: Kazakstan
Approvals package, working documentation
Yuzhnoye Khylchuyu field 1987 Petroleum gas treatment unit for removing H2S with sulfur recovery
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Tengiz oil field 1987 Sulfur removal facility, sulfur recovery and Tail Gas Clean-up II stage
Регион, страна: Russia
Approvals package, working documentation
Slavneft-Yaroslavnefteorgsintez 1987 Revamp of sulfur dioxide plant by hydrogen to H2S on alumina-cobalt-molybdenum catalyst agent
Регион, страна: Russia
Approvals package, working documentation
Lisichansk Oil Refinery 1987 Sulfur recovery and MEA regeneration units, II stage
Регион, страна: Ukraine
Approvals package, working documentation
San-Fuegos, Oil Refinery 1986 Sulfur recovery and DEA regeneration units, II stage
Регион, страна: Cuba
Approvals package, working documentation
Orenburg gas processing plant 1986 Revamp of gas sweetening plant, sulfur recovery and tail gas treating, IV stage. Revamp of Tail Gas Treatment Units, II stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Djar Kuduk gas field 1986 Revamp of gas treatment unit
Регион, страна: North Afghanistan
Approvals package, working documentation
Mubarek gas-processing plant 1985 Revamp of sulfur recovery unit
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Shurtan gas field 1985 Natural gas-sweetening plant on solid sorbents, III block, including gas sweetening
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Achinskiy Oil Refinery 1985 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
Approvals package, working documentation
Hermanos Diaz Oil refinery 1984 Sulfur recovery and DEA regeneration units
Регион, страна: Cuba
Approvals package, working documentation, including non-standard equipment
Ukhtinsky Oil Refinery 1984 Sulfur recovery unit
Регион, страна: Bashkortostan, Russia
Approvals package, working documentation, construction design supervision
Ufimsky Oil Refinery 1984 Sulfur recovery and MEA regeneration units
Регион, страна: Bashkortostan, Russia
Approvals package, working documentation, including non-standard equipment
Sovetobad gas field 1984 Amine Plant with commercial production of sulfur, 5 bln.m3/yr
Регион, страна: Turkmenistan
Approvals package, working documentation, including non-standard equipment
Slavneft-Yaroslavnefteorgsintez 1984 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
Approvals package, working documentation
Otradnensky gas processing plant 1984 Revamp of sulfur recovery unit, I stage
Регион, страна: Russia
Approvals package, working documentation
Orenburg gas processing plant 1984 Revamp of sulfur recovery and tail gas treatment units, III stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1984 Expansion of gas production to 25 bln.m3/yr, IV stage. Automatic Process Control System of low sulfurous gas treatment plant, at Zaverdy field
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Lukoil-Permnefteorgsintez 1984 Elemental sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Slavneft-Yaroslavnefteorgsintez 1984 Sulfur recovery and MEA regeneration units
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Orenburg gas processing plant 1983 Revamp of sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Nizhnekamsk Oil Refinery 1983 Amine regeneration and sulfur recovery units, II stage
Регион, страна: Russia
Approvals package, working documentation
Mubarek gas-processing plant 1983 Tail gas treating unit by "Sulfren" method, 1-th and 2-th blocks. Revamp of sulfur recovery unit, I stage, 4-th block
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Shurtan gas field 1983 Natural gas sweetening plant on solid sorbents, IV block, including gas sweetening
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
North Balkui field 1983 Sulfur recovery unit
Регион, страна: Turkmenistan
Working documentation
Zhanazholsky field 1983 Sulfur removal and sulfur recovery unit, II stage
Регион, страна: Kazakstan
Approvals package, working documentation
Lokachinskoe gas field 1983 Gas sweetening plant
Регион, страна: Ukraine
Working documentation
Novogroznensky Oil Refinery 1982 Revamp of amine regeneration and sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation
Mubarek gas-processing plant 1982 Revamp of natural gas sweetening shop from H2S and CO2, I stage
Регион, страна: Uzbekistan
Approvals package, working documentation, construction design supervision
Tengiz oil field 1981 Gas sweetening plant and sulfur recovery, I stage. Facility complex on gas sweetening, sulfur removal facility and sulfur recovery
Регион, страна: Kazakstan
Working documentation
Mubarek gas-processing plant 1981 Gas sweetening plant, tail gas cleanup of sulfur recovery unit, IV stage
Регион, страна: Uzbekistan
Approvals package, working documentation
Moscow Oil Refinery 1981 Revamp and expansion of sulfur removal facility, solution regeneration and sulfur recovery
Регион, страна: Russia
Approvals package, working documentation
Shurtan gas field 1981 Gas sweetening and sulfur recovery unit, 16 bln.m3/yr
Регион, страна: Uzbekistan
Working documentation
Zhanazholsky field 1981 - 1982 Sulfur removal facility and sulfur recovery unit, Zhanazholsky field
Регион, страна: Kazakstan
Approvals package, working documentation
Baku Oil Refinery 1981 Amine regeneration plant of sulfur recovery from tail gas cleanup TCS
Регион, страна: Azerbaijan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Astrakhan gas processing plant 1981 Gas sweetening and sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation
Niko Lopez Oil Refinery 1980 Revamp of sulfur recovery and DEA regeneration units, II stage
Регион, страна: Cuba
Approvals package, working documentation
Mubarek gas-processing plant 1980 High sulfurous gas sweetening units, tail gas cleanup of sulfur recovery units, I, II and III stages. Revamp of low sulfurous gas sweetening units, Kultaksko-Zavardinsky cluster of fields
Регион, страна: Uzbekistan
Approvals package, working documentation
Kuibyishevsky Oil Refinery OWC 1980 Gas sweetening plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Novogroznensky Oil Refinery 1979 Sulfur recovery and Amine regeneration units. Complex of secondary processes
Регион, страна: Russia
Approvals package, working documentation
Volgograd Oil Refinery 1979 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Achinskiy Oil Refinery 1979 Solution regeneration and Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Chimkent Oil Refinery 1978 Treatment and recovery of low sulfurous gases
Регион, страна: Kazakstan
Working documentation, including non-standard equipment
Pavlodar Oil Refinery 1978 Sulfur recovery and MEA regeneration units
Регион, страна: Kazakstan
Approvals package, working documentation, including non-standard equipment
Nizhnekamsk Oil Refinery 1978 Sulfur utilization from atmospheric gas oil hydrodesulfurization plant and from ethylene production plant, III stage
Регион, страна: Russia
Working documentation, including non-standard equipment
North Balkui field 1978 Natural gas sweetening plant using amine method, sulfur recovery unit
Регион, страна: Turkmenistan
Approvals package, working documentation, including non-standard equipment
Izmir Oil Refinery 1978 Amine Plant of liquefied petroleum gas. Revamp of desulfurization shop and sulfur recovery equipment, I stage
Регион, страна: Turkey
Approvals package, working documentation, including non-standard equipment
Niko Lopez Oil Refinery 1977 Revamp of Sulfur recovery and DEA regeneration units
Регион, страна: Cuba
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1977 Expansion of gas recovery in gas sweetening section to 15 bln.m3/yr., III stage, and Sulfur recovery from gas sweetening section to 10 bln.m3/yr. II stage
Регион, страна: Uzbekistan
Approvals package, working documentation
Lisichansk Oil Refinery 1977 Sulfur recovery and MEA regeneration units
Регион, страна: Ukraine
Approvals package, working documentation
Hermanos Diaz Oil refinery 1976 Revamp of Sulfur recovery and MEA regeneration units
Регион, страна: Cuba
Approvals package, working documentation, including non-standard equipment
San-Fuegos, Oil Refinery 1976 Revamp of Sulfur recovery and DEA regeneration units, I stage
Регион, страна: Cuba
Approvals package, working documentation, including non-standard equipment, construction design supervision
Nizhnekamsk Oil Refinery 1976 Sulfur recovery and Amine regeneration units, II stage of petrochemical complex
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1976 Revamp with purpose to bring production to 15 bln.m3/yr: TCS of sulfur recovery using direct oxidation; gas sweetening section, II stage
Регион, страна: Uzbekistan
Working documentation
Shurtan gas field 1976 Natural gas sweetening plant
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Lisichansk Oil Refinery 1976 Revamp of Sulfur recovery and MEA regeneration units
Регион, страна: Ukraine
Working documentation
Buturinskoe oil field 1976 Natural gas sweetening plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Chimkent Oil Refinery 1975 Sulfur recovery and Amine regeneration units
Регион, страна: Kazakstan
Approvals package, working documentation, including non-standard equipment
Tuimazy oil field 1975 Associated gas sweetening plant, and sulfur recovery unit
Регион, страна: Kazakstan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Permsky gas processing plant 1975 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Otradnensky gas processing plant 1975 Sulfur recovery unit, II stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mubarek gas-processing plant 1975 Revamp of gas sweetening section. TCS of sulfur recovery from low sulfurous gases by direct oxidation method. II stage of sulfur recovery
Регион, страна: Uzbekistan
Working documentation
Ukhtinsky Oil Refinery 1974 Sulfur recovery unit from low sulfurous gases by direct oxidation method
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Moscow Oil Refinery 1974 Revamp of Sulfur removal facility, solution regeneration and sulfur recovery
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Danube Oil Refinery 1974 Sulfur recovery unit
Регион, страна: Bulgaria
Approvals package, working documentation, including non-standard equipment
Djar Kuduk gas field 1974 Gas sweetening unit
Регион, страна: North Afghanistan
Approvals package, working documentation, including non-standard equipment
Tissaisky Oil Refinery 1973 Sulfur recovery unit to remove Н2S
Регион, страна: Bulgaria
Approvals package, working documentation, including non-standard equipment
Tatneft 1973 Gas sweetening unit of high-sulfur crude oil with elemental sulfur recovery, “Tatneftegas” plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Saratov Oil Refinery 1973 Revamp of Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Orenburg gas processing plant 1973 TCS revamp of sulfur and tail gases
Регион, страна: Russia
Working documentation
Mubarek gas-processing plant 1973 Revamp of absorbers of 1-st and 2-nd stages
Регион, страна: Uzbekistan
Approvals package, working documentation
Moscow Oil Refinery 1973 Sulfur recovery unit. "Dry gas" treatment unit and MEA centralized regeneration
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Kirishsky Oil Refinery 1973 MEA regeneration unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Djar Kuduk gas field 1973 Expediency of accessing of gas field clusters containing H2S, to existing gas line system
Регион, страна: North Afghanistan
Working documentation
Volgograd Oil Refinery 1973 "Dry gas" treatment unit, elemental sulfur recovery unit. Crude oil processing unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Orenburg gas processing plant 1972 TCS of tail gas cleanup and sulfur recovery
Регион, страна: Russia
Approvals package, working documentation
Mubarek gas-processing plant 1972 Sulfur recovery section, I and II blocks. Revamp of sulfur recovery unit I
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment
Kremenchug Oil Refinery 1972 Revamp of process gas production. Gas sweetening and sulfur recovery units
Регион, страна: Ukraine
Approvals package, working documentation, including non-standard equipment
Achinskiy Oil Refinery 1972 MEA regeneration and Sulfur recovery units, I stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Pavlodarsky Oil Refinery 1971 MEA regeneration and sulfur recovery units, I stage
Регион, страна: Kazakstan
Approvals package, working documentation, including non-standard equipment
Otradnensky gas processing plant 1971 Revamp and expansion of elemental sulfur recovery unit, II stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mazeiku Oil Refinery 1971 Elemental sulfur recovery unit and MEA regeneration unit
Регион, страна: Lithuania
Approvals package, working documentation, including non-standard equipment
Kremenchug Oil Refinery 1971 Sulfur recovery and MEA regeneration units
Регион, страна: Ukraine
Approvals package, working documentation
Naftan Oil Refinery 1971 Sulfur recovery unit from H2S
Регион, страна: Belarus
Approvals package, working documentation, including non-standard equipment
Almetyevneft ORP 1971 Revamp and expansion of the following plants: sulfur removal, sulfur recovery, high-sulfur crude oil associated gas sweetening with elemental sulfur recovery
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Moscow Oil Refinery 1970 Revamp and expansion of sulfur removal facility and sulfur recovery
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Mozyr Oil Refinery 1970 - 1972 Amine regeneration and sulfur recovery unit
Регион, страна: Belarus
Approvals package, working documentation, including non-standard equipment, construction design supervision
Achinskiy Oil Refinery 1970 Sulfur recovery unit, I stage
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Orenburg gas processing plant 1969 TCS Complex of gas and gas condensate treatment. Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Oil Refinery within Petrochemical complex, Pleven 1969 Sulfur recovery unit
Регион, страна: Bulgaria
Approvals package, working documentation, including non-standard equipment, construction design supervision
Mubarek gas-processing plant 1969 Revamp of sulfur recovery unit
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Kremenchug Oil Refinery 1968 Sulfur recovery section from H2S. I stage of revamp and expansion of Sulfur recovery unit
Регион, страна: Ukraine
Approvals package, working documentation
Permsky gas processing plant 1967 Associated gas treatment. Sulfur recovery unit. Gas sweetening section
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Ungi Oil Refinery 1967 Sulfur recovery unit
Регион, страна: Korea
Approvals package, working documentation, including non-standard equipment, construction design supervision
Ufimsky Oil Refinery 1966 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Mubarek gas-processing plant 1966 Sulfur recovery unit, chemical storeroom
Регион, страна: Uzbekistan
Approvals package, working documentation, including non-standard equipment, construction design supervision
Izmir Oil Refinery 1966 Sulfur recovery unit
Регион, страна: Turkey
Approvals package, working documentation, including non-standard equipment, construction design supervision
Khabarovsk Oil Refinery 1965 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Saratov Oil Refinery 1965 Sulfur recovery unit from H2S
Регион, страна: Russia
Approvals package, working documentation
Omsk Oil Refinery 1965 Gas sweetening plant and oil and gas dehydration process
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Lithuanian Oil Refinery 1965 Sulfur recovery from Н2S and MEA regeneration
Регион, страна: Lithuania
Approvals package, working documentation, including non-standard equipment
Kirishsky Oil Refinery 1965 Expansion of sulfur recovery shop from H2S, II stage. Construction of I stage of sulfur recovery shop from H2S
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Ufimsky Oil Refinery 1964 Revamp of lean petroleum gas sweetening plant, sulfur recovery shop and MEA plant of fraction cleanup H2+C1+C2
Регион, страна: Russia
Approvals package, working documentation, construction design supervision
Korobkovskoe oil field 1964 Sulfur recovery unit from H2S
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Kirishsky Oil Refinery 1964 Sulfur recovery shop from H2S
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Kuibyshevsky Oil Refinery 1963 Sulfur recovery shop from H2S within IV stage of expansion and revamp of "Kuibyshevsky" Oil Refinery
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Chernikovsky Oil Refinery 1962 Dry gas sweetening plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Ryazansky Oil Refinery 1962 Dry gas sweetening plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Novo-Ufimsky Oil Refinery 1962 Sulfur recovery unit
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Ryazansky Oil Refinery 1961 Sulfur recovery shop by three-stage "Claus" method
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Santiago Oil Refinery 1961 Thermal and catalytic methods of sulfur recovery unit
Регион, страна: Cuba
Approvals package, working documentation, including non-standard equipment
Moscow Oil Refinery 1961 Sulfur recovery and oil gas sweetening plants
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment, construction design supervision
Chernikovsky Oil Refinery 1960 Dry gas sweetening plant
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Ufimsky Oil Refinery 1960 Gas and oil gas sweetening plant by MEA methods
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Novo-Ufimsky Oil Refinery 1960 Gas and liquid oil streams sweetening plant by MEA methods
Регион, страна: Russia
Approvals package, working documentation, including non-standard equipment
Burgas Oil Refinery 1960 Dry gas sweetening plant by MEA methods
Регион, страна: Bulgaria
Approvals package, working documentation, including non-standard equipment